




The Hermitage School approached us with a requirement for a striking entrance canopy to enhance the front of their building and provide essential shelter. After reviewing the site and understanding their needs, we proposed two design options: the Uxbridge and the Keston Dual Pitched canopy. The client selected the Keston Dual Pitched design as it complemented the existing rooflines behind the entrance area, creating a cohesive look.
The chosen canopy featured polycarbonate glazing and a robust steel frame, powder-coated in RAL 5010 Gentian Blue for maximum visual impact. Our team managed the project from initial design through to installation, ensuring minimal disruption and a seamless process. The result is a bold, functional entrance feature that not only elevates the school’s appearance but also provides durable, year-round protection -built to last for years to come.
Timescale – 8 weeks for design and fabrication, 2 days for on-site installation.





We always advise that you call your local planning authority as there are no hard and fast rules. They will advise on whether you require planning permission for your proposed canopy. Although it differs from region to region canopies under 30m2 may not require permission but this can be affected by situations such as proximity to neighbours, listed building status, conservation areas etc. so it always best to check. We are happy to provide free of charge, scaled drawings etc. of the proposed canopy structure to assist your application should you require.
Yes unlike some solutions that need to be taken down in the winter or during high winds our canopies are designed to be useable all year round. The cladding materials as well as providing shade are also waterproof so that they can be used during wet weather.
In relation to our canopies Building Regulations specify the standard to which they should be built i.e. strength, fire rating of materials etc. Again it is advisable to contact your local Building Control officer(s), as a rule of thumb any canopy over 30m2 will require conformity to building regulations and an application will need to be made although this figure can be lower. Most of our structures are supplied conforming to the requirements for these regulations as standard and generic sets of structural calculations can be supplied free of charge to demonstrate to Building Control the integrity of the proposed structure and foundations.
Subject to appropriate cleaning and maintenance we offer the following guarantees:-
No, all canopies are fixed on to concrete pads or bases as the structures can lift out from the ground if not fixed into a suitable concrete base due to the uplift created by wind acting on the roof area.
No, our prices are all inclusive.
We are a sound, family run company with a high credit rating, which has been manufacturing and installing modular steel buildings for over 45 years. A great deal of our work comes from repeat business and recommendations from existing customers (references available on request). We aim for 100% satisfaction 100% of the time. As well as being CHAS (Contractors Health and Safety Scheme) accredited, Construction Line registered we are a approved contractor to many Local Authorities and large building contractors. You will be allocated a dedicated Contract Manager who can be contacted to answer any questions that you may have at any point in the process.
Each canopy framework is supplied in the colour of choice from the standard RAL range. A match for most school colour schemes can be found with that range if required.
We use a two part glazing bar on our canopies with rubber gasket or cushions to attach the roof polycarbonate sheets as this allows for the expansion of the sheets as the weather heats up or cools down. The rubber gaskets as well as creating a watertight seal greatly reduce noise levels as the sheets expand and contract. We do not screw sheets directly to the framework as this can lead to the roofing sheets buckling and potentially causing leaks due to the possibility of screw heads popping off. In addition to this we never lap one sheet over the other as this can result in an algae build-up resulting in unsightly discoloured patches in the roof.
We have been working within schools for many years. All contractors are Clovis approved and CRB checked. Full risk assessments are carried out prior to starting installation taking into consideration your requirements and safety fencing is erected wherever needed at no additional charge.
We'd love to hear from you






